River Cam – update on bridge closure over Bottisham Lode

There is a bridge closure on the east bank of the Cam just north of Bottisham lock, involving a footbridge over Bottisham Lode, next to the pumping station, (grid ref  510658). A diversion is signed south east on a footpath along Bottisham Lode to a footbridge near Vicarage Farm, with a return along the other side of the Lode. This diversion adds 1.2 miles to your walk!

The bridge has been closed by the Environment Agency (EA) because of a significant Health & Safety risk. Unfortunately, the costs involved to carry out the necessary repairs exceeded available funds in the last financial year. The EA  applied for an extension of the ‘Temporary Traffic Regulation Order’ through to April 2026 – but we are now nearly at the end of the year and the bridge is still closed! Together with the local Ramblers Group we are trying to find out when repairs will take place.

 

(Visited 518 times, 1 visits today)